An ARIMA model explains a time series by its own past values (AR) and past forecast errors (MA), after differencing (I) to remove trends. Box and Jenkins systematized the approach in 1970.
Contents
  1. 1. What is an ARIMA model?
  2. 2. Stationarity and differencing
  3. 3. The Box–Jenkins cycle
  4. 4. Limitations
  5. 5. Frequently asked questions
  6. 6. References

What is an ARIMA model?

An ARIMA (AutoRegressive Integrated Moving Average) model explains the current value of a time series using its own past values and past forecast errors. Series with trends are first differenced to make them stable. George Box and Gwilym Jenkins set out the full model-building procedure in *Time Series Analysis: Forecasting and Control* (1970), so it is also called the Box–Jenkins method.

📌 At a glance
AR(p)
regression on p past values
I(d)
differenced d times to reach stationarity
MA(q)
regression on q past errors
Notation
ARIMA(p, d, q)

Stationarity and differencing

ARIMA assumes a stationary series whose mean and variance do not drift. Trending series such as GDP are differenced once (period-to-period change) or occasionally twice. Unit-root tests, above all the augmented Dickey–Fuller (ADF) test building on Dickey and Fuller (1979), help decide.

The Box–Jenkins cycle

  1. Identify candidate p, d, q from ACF and PACF plots.
  2. Estimate coefficients, comparing models with AIC or BIC.
  3. Diagnose residuals with the Ljung–Box test (1978) to check for white noise.
  4. Forecast with the model that passes.
ModelACFPACF
AR(p)DecaysCuts off after p
MA(q)Cuts off after qDecays
ARMADecaysDecays

How do utilities forecast tomorrow's power demand? The simplest assumption is that past patterns continue. ARIMA turns that intuition into a model; when patterns repeat every summer, seasonal ARIMA (SARIMA) adds seasonal differencing.

Limitations

ARIMA is linear and struggles with structural breaks. When volatility clusters, as in financial returns, analysts add a GARCH model for the variance. The claim that prices are hard to forecast from past data links to the efficient market hypothesis.

Frequently asked questions

What does ARIMA(1,1,1) mean?
The once-differenced series is explained by one lagged value and one lagged error.
How many times should I difference?
Usually once, rarely twice, guided by unit-root tests and plots.
ARIMA vs ARMA?
ARMA is for stationary series; ARIMA adds differencing for non-stationary ones.

References

  1. Box, G. E. P., & Jenkins, G. M. (1970). Time series analysis: Forecasting and control. Holden-Day.
  2. Dickey, D. A., & Fuller, W. A. (1979). Distribution of the estimators for autoregressive time series with a unit root. Journal of the American Statistical Association, 74(366), 427–431.
  3. Ljung, G. M., & Box, G. E. P. (1978). On a measure of lack of fit in time series models. Biometrika, 65(2), 297–303.

Reports and materials that use this theory (Korean)

There are no materials dedicated to this theory yet, but you can search related reports in the CampusDown library (Korean).

Find more reports · Search 'ARIMA 모형' on CampusDown →

You may also like

Latest ArticlesView all ›

New guides for college study and assignments (Korean)

This article was last updated on October 23, 2026. It is based on widely recognized original works and textbooks; when citing it in a paper, please check the original sources listed in the references.